This stage involves fitting external windows and glazed doors to the structure. This improves weatherproofing, enhances security, and allows natural light into the building, progressing the project toward a lock-up stage.
Continue ReadingCabinetry
This stage involves manufacturing and installing all cabinets for kitchen, bathroom, laundry, built-in or walk-in robes.
Continue ReadingTiling
This stage involves laying wall and floor tiles in wet areas such as bathrooms, kitchens, and laundries. This provides a durable, water-resistant finish and prepares surfaces for final fixture installation.
Continue ReadingFixtures & Fittings
Interior Fitout
This stage involves installing internal doors, skirting, and initial services fit-off, transforming the structure into functional living spaces in preparation for final finishes and completion.
Continue ReadingFlooring
This stage involves installing final floor finishes such as timber, laminate, vinyl, or carpet. This enhances durability, comfort, and completes the internal aesthetic of the space.
Continue ReadingPlasterboard Lining
This stage involves fixing wall and ceiling linings to the internal frame, followed by jointing and setting. This creates smooth internal surfaces ready for painting and finishing.
Continue ReadingElectrical Rough-in
This stage involves installing wiring, conduits, and electrical boxes within walls and ceilings before linings are applied. This sets up the infrastructure for power, lighting, and communication systems prior to final fit-off.
Continue ReadingExternal Cladding
This stage involves installing the building’s external wall finishes, such as brickwork, timber, or fibre cement cladding, providing weather protection, thermal performance, and defining the overall appearance of the building.
Continue ReadingRoofing
This stage involves installing the roof structure covering, including insulation, sarking, and roof sheeting or tiles, making the building weatherproof, protecting the internal structure and allowing internal works to commence.
Continue ReadingFraming
This stage involves constructing the structural skeleton of the building, including walls, floors, and roof framing. This defines the building’s shape and layout, preparing it for roofing, cladding, and internal works.
Continue ReadingTree Removal
Stormwater
Foundation
This stage is considered complete once the slab or footing system has achieved sufficient strength and all compliance requirements have been satisfied.
Continue ReadingSite Establishment
CC Plans
This confirms the design complies with the NCC, relevant standards, and development consent, allowing construction to legally commence.
Continue ReadingDevelopment Approval
DA granted by Central Coast Council
Continue ReadingPlanning Notes
Legislative, geotechnical notes
Continue ReadingSite
Site photos taken on 7 May 2021
Continue ReadingConcept Design
Site plan, floor plans, elevations, sections
Continue Reading