Berkeley Vale Addition

24 Albatross Rd Berkeley Vale

✓ Under Construction

Swipe left or right to view each milestone.
Tap on each stage to view details.

Design / Approval
✓
100%
Approval Granted

Design Stages

  • ✓ Concept Design
  • ✓ DA Approval
  • ✓ CC Approval
  • ✓ CDC Approval
  • ✓ Building Contract Signed
Construction
⚒
39%
Under Construction

Construction Stages

  • ✓ Demolition
  • ✓ Sitework
  • ✓ Foundation
  • ✓ Hydraulics
  • ✓ Framing
  • ✓ Roofing(50%)
  • ✓ Window Installation
  • ✓ External Cladding
  • ✓ Electrical Rough-in
  • ✓ Plumbing Rough-in
  • ✓ Insulation
  • ✓ Plasterboard Lining
Finishing
★
0%
Not Started

Finishing Stages

  • ✓ Interior Fitout
  • ✓ Flooring
  • ✓ Tiling
  • ✓ Cabinetry
  • ✓ Fixtures & Fittings
  • ✓ Final Inspection

Project Information

  • Project Type: First Floor Addition
  • Approval Pathway: CDC
  • Commencement: 23/3/2025

Project Documents

  • CDC Plans
  • Structural Engineering Drawings